WATER CONNECTION |
 |
|
|
How to Apply
To Download Application Form Click Here
-
For obtaining a water connection for areas falling in the jurisdiction of MCD, the consumer should contact the concerned Zonal Engineer(W) .
-
The consumer can obtain a water connection in Unauthorized / Regularised colonies, Approved colonies, Resettlement colonies / Urban Villages, Rural Villages for domestic / commercial / industrial purposes, as provided under the rules.
-
Application form will be available with ZRO/ZE(W) at the cost of Rs. 10/- . The form downloaded from website can also be used for seeking new water connection.
-
Application form complete in all respect shall be accepted on the spot at ZE office & ZE will send the file to ZRO concerned for ensuring non-pending of any dues by next day.
-
ZRO concerned will intimate no dues certificate or details of any due within 3 working days from receipt of file.
-
ZE will give technical sanction/clearance within 2 days from receipt of file and intimate to the consumers & send the file to ZRO concerned for depositing of Water Connection charges including RR charges & Development charges/Meter Security if any etc.
-
ZRO(W) concerned will issue bill for payment on the same day on receipt of file.
-
Applicant has to make payment on the bill raised within 24 hrs & submit copy of receipts to ZE concerned.
- ZE will give boring permission for connection to be done by qualified plumber. He shall ensure physical verification of boring/laying of line on appointed date by self or deputing JE/Fitter.
| Water Connection to Group Housing Societies/ Localities: |
-
The Developing Agencies, before laying of water supply services, are required to get the Water Supply Scheme approved from the Planning Circle of the Delhi Jal Board located at Varunalaya Phase-I, Karol Bagh, New Delhi.
-
The water supply scheme is to be submitted in five sets, along with the hydraulic calculations and other details as under: -
| Hydraulic Calculations |
Water Requirement Chart |
| Reference line |
Reference line |
| Length (Mtrs.) |
Self water requirement (Gpd.) |
| Average Water requirement |
Addl. Water requirement (Gpd.) |
| Peak Water Requirement (3xAV) |
Total water requirement |
| Diameter (mm). |
|
| Hydraulic loss/1000m |
|
| H.L. (mtrs.) |
|
| G.L. (mtrs.) |
|
| T.H. (mtrs.) |
|
| Remarks |
|
- After scrutiny of the scheme by Planning Circle and deposit of necessary Central Storage Charges @ Rs.2/- per litre of the total daily average water requirement, approval is conveyed to the developing agency indicating size of ferrule/connection and conveyance main upto the proposed water tank to be constructed by the developing agency. The approval is conveyed within 10 days of deposit of Central Storage Charges.
- On approval of the scheme by the Planning Circle, the Developing agency is required to apply for sanction of water connection in the office of Zonal Engineer (Water) of the area. The water connection shall be sanctioned within 30 days.
- The developing agency is required to lay and maintain the ferrule connection and conveyance main upto the reservoir.
| TIME SCHEDULE FOR SANCTION OF NEW WATER CONNECTION |
| PARTICULARS |
ACTION BY |
TIME SCHEDULE |
|
|
|
On all working days between 10 a.m. to 4 p.m. Cost Rs.10/- |
|
Acceptance of application form and issue of acknowledgement |
Zonal Engineer (W) |
Form complete in all respect shall be accepted on the spot and send the file to ZRO concerned on next day. |
|
No dues / Development Charges / Unauthorised water connection report. |
ZRO(W)/ Survey Officer |
Within three working days. |
|
Technical clearance and intimation to the consumer and ZRO (W) |
Zonal Engineer(W) |
Within 2 days |
|
Issue of bill for payment |
ZRO (W) |
Same day |
|
Payment of Bill |
By consumer |
Within 24 hours |
|
Boring permission |
|
To be obtained by Qualified Plumber from Zonal Engineer (Water). |
-
Road Restoration Charges estimate to be obtained by the applicant from Zonal Engineer (Works), MCD and same to be deposited with his office.
- Any water connection installed in violation of the above procedure, either on the part of the applicant or the Plumber engaged by him, shall be treated as unauthorized water connection and is liable to be disconnected without any notice. The same can, however, be regularized on submission of application and completion of all the above formalities with payment of penalty and usual charges plus cost of water, as applicable from time to time.
| REGULARISATION OF UNAUTHORISED WATER CONNECTION |
-
The consumer will have to pay enhanced penalty / charges together with cumulative water charges for 3 years as under, apart from facing the risk of disconnection of water connection.
-
Penalty of Rs.3000/- per unauthorized connection.
-
Water Charges per month for the respectively Category for the past three years.
-
Water Development Charges, wherever applicable. (Rates of Development charges have been indicated separately in this book.)
- Usual initial charges such as opening fee, water advance and R.R. Charges etc.
| WATER METERS SECURITY / TESTING |
| I. |
For all connection of Domestic, Commercial and Industrial category, water meters shall be installed by the Board against deposit of Meter Security which, at present is as follows:
| SIZE OF METER |
METER SECURITY |
| 15 mm |
Rs.400/- |
| 20 mm |
Rs.800/- |
| 25 mm |
Rs. 1000/- |
| 40 mm |
Rs. 1600/- |
| 50 mm |
Rs. 2700/- |
| 80 mm |
Rs. 3400/- |
| 100 mm |
Rs. 5000/- |
| 150 mm |
Rs. 7600/- |
| 200 mm |
Rs. 16500/- |
| 250 mm |
Rs.20000/- |
| 300 mm |
Rs. 29000/- |
However, in case of domestic meters of size 15 mm, the consumers can install their own ISI meters like Rahul, Chambal, Anand Sahi, Capstan, NB, Actaris,Sanchuan, Elster Model-M-120, Elster Model-M-170, Kranti, Crescent in which case they are not required to deposit the Security Charges.
|
| II. |
TESTING
The department has arrangements for testing of meters at its workshop at Andrews Ganj. The consumer can get his meter, installed by the Board, tested on payment of fees as per following:
| SIZE OF METER(MM) |
TESTING FEE(Rs.) |
| 15 |
50/- |
| 20-25 |
100/- |
| 40-50 |
200/- |
| 80 and above |
400/- |
In case of private meters, which are removed and refixed by a Licensed Plumber/Registered Consumer, Rs.25/- only will be charged as testing fee for 15mm water connection.
|
| III. |
PROCEDURE FOR TESTING OF DEFECTIVE/FAST METERS:
| 1. |
Testing of defective/ Fast Water meters |
Within 15 days after deposit of necessary fee. |
| 2. |
Communication of Testing result to Consumer. |
Within 7 days after testing. | | | |
| |
|
SUPPLY OF WATER TANKERS |
| On account of non-availability of water due to leakage/bursts in water lines or any faults in the system. |
Zonal Engineer (W) / Water Emergency |
Within 3-hrs. of complaint Subject to availability of Tanker in Water Emergency. The service is free of cost. |
| For private functions like marriages, Religious functions etc. |
Zonal Engineer (W) / Incharge of Water Emergency |
On all working days. Atleast 15 days in advance On first come first bases. | |
| Charges for Booking of Tankers |
| DISTANCE |
STATIONARY |
FILLING |
| Upto 5 Kms. |
Rs.400/- |
Rs.225/- |
| 5 Kms. to 10 Kms. |
Rs.600/- |
Rs.325/- |
| Beyond 10 Kms. |
Rs.1000/- |
Upto 15 Kms.Rs.425/- Beyond 15 Kms. Rs.450/- | |
| |
| Lodging of complaint regarding leakage / non-availability of water / contamination of water etc. |
Central Control Room at Varunalaya Ph-II |
Telephone Number are 1916 / 23538495 and 23527679. (Round the clock) | |
|
|
| Zone |
Tel. Numbers |
| Ashok Vihar |
27411130,27411131 |
| Greater Kailash -I |
26218543,26218544 |
| Holambi |
27700006,27700007 |
| Jal Sadan |
29810034,29810035 |
| Kewal Park |
27681231,27681232 |
| Mangolpuri OHT |
27912818,27912819 |
| Preet Vihar |
22021078,22021079 |
| Punjabi Road No. 41 |
25171926,25228032 |
| R.K.Puram |
26193244,26193218 |
| Sarita Vihar |
29941824,29941825 |
| Mandawali |
22781280,22781331 |
| Vasant Kunj |
26132160,26132161 |
| Chandrawal WW No.02 |
23814338,23810930 |
| Giri Nagar |
26473720,26449877 |
| Idgah |
23537397,23672129 |
| I.P. Pumping Station |
23370911 |
| Janakpuri D-block |
25617750,25617751 |
| Loni Road |
22812669,22812670 |
| Najafgarh OHT |
25322153,25322154 |
| Paschim Vihar |
25275259,25275260 |
| Qutab Pump House |
26642493,26642495 |
| Rajinder Nagar OHT |
25860438,25860514 |
| Shivaji Enclave Rajouri Garden |
25228032,25220703 |
| Shastri Nagar |
23640003,23640009 |
| Yamuna Vihar |
22812682,22812683 |
| Central Control Room |
23527679 |
| Varunalaya Phase-II |
23538495/1916 | |
|
Laboratories |
| Zone |
Telephone Numbers |
| Wazirabad |
23814322 |
| Haiderpur |
27552446,27552447 |
| Bhagirathi |
22561930 |
| Okhla |
26910524,2910176 |
| Nangloi |
25948033 |
| RWS |
26224924 | |
| Action on Complaints |
| Type of Complaint |
Incharge |
Action taken Time |
| Regarding leakage in Municipal Water Mains / Lines etc. |
Zonal Engineer (W) |
Within 48 Hrs. |
| Contaminated water supply / quality of water. |
Zonal Engineer (W) / DTQC / Area ACWA |
Within 24 Hrs. |
| Failure of Pumping System |
Zonal Engineer (W) / Asstt. Engineer (E & M) concerned |
Same Day | |
ZONAL OFFICES (WATER) DELHI JAL BOARD |
|
CENTRAL -I |
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. Mahinder Kumar |
EE(Central-I) |
23269053 |
| Sh. Jasbir Singh |
ZE(Central-I) |
23269053 |
| Sh. Kutub Singh |
ZE(Central-I) |
23280065 |
| Sh. Mohd. Saleem |
ZE(Central-I) |
23269053 |
| Sh. J.P.Gupta |
ZE(Central-I) |
23280065 |
| Sh. M.S.Khan |
ZE(Central-I) |
23280065 |
| Sh. Chanderjit Kumar |
ZE(Central-I) |
23280065 |
| Sh. R.K.Singh |
ZE(Central-I) |
23280065 |
| Sh.R.P Verma |
ZE(Central-I) |
23814338 |
| Sh.M.K.Sinha |
ZE(Central-I) |
9650291510 |
| Sh.R.S.Khan |
ZE(Central-I) |
9650290759 |
| Sh.Bhola Ram |
ZE(Central-I) |
9650291473 |
|
|
CENTRAL -II |
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. Radhe Shyam |
EE(Central-II) |
23698431 |
| Sh. Bindra Prasad |
ZE (Central-II) |
23698431 |
| Sh. Devender Giri |
ZE (Central-II) |
23698431 |
| Sh. Horender Kumar |
ZE (Central-II) |
23698431 |
| Sh. R.K.Jain |
ZE (Central-II) |
23698431 |
| Sh.Ajay Kumar |
ZE (Central-II) |
23698431 |
| Sh.D K Gupta |
ZE (Central-II) |
23698431 |
| Sh.O.P.Chawal |
ZE (Central-II) |
23698431 |
|
|
NORTH-I |
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. Vijay Singh |
EE (North-I) |
27604862 |
| Sh. P. C. Aggarwal |
ZE(North-I) |
27604862 |
| Sh. S.K.Singh |
ZE(North-I) |
27604862 |
| Sh. Toran Singh |
ZE(North-I) |
27604862 |
|
|
NORTH WEST-IV |
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. Adarsh Kumar |
EE (North West-IV) |
27615600 |
| Sh. V.P. Yadav |
ZE(North West-IV) |
27615600 |
| Sh. R.C.Duggal |
ZE(North West-IV) |
47092861 |
| Sh. R.C.Sharma |
ZE(North West-IV) |
27615600 |
| Sh. A.K.Bhardwaj |
ZE(North West-IV) |
27673064 |
|
|
NORTH-WEST-I |
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. P.K.Tyagi |
EE (North West-I) |
25964317 |
| Sh. Lalit Kumar Singhal |
ZE(North West-I) |
25964317 |
| Sh. R.P. Kukreja |
ZE(North West-I) |
27924132 |
| Sh. Bijender Kumar |
ZE(North West-I) |
25964317 | |
|
NORTH WEST -II |
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. Shalabh Kumar |
EE(North West-II) |
27061040 |
| Sh. Horender Kumar |
ZE(North West-II) |
27061040 |
| Sh. Liaqat Ali |
ZE(North West-II) |
27061040 |
| Sh. A.J. Khan |
ZE(North West-II) |
27061040 | |
|
NORTH WEST -III |
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. G.R.K. Bansal |
EE(North West-III) |
27462285 |
| Sh. K.S. Shukla |
ZE(North West-III) |
27464656 |
| Sh. R. K. Sharma |
ZE(North West-III) |
27416373 |
| Sh. R.C. Sharma |
ZE(North West-III) |
27464656 | |
|
|
|
WEST-I |
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. |
EE (West-I) |
25125273 |
| Sh. S.P. Goel |
ZE(West-I) |
25125273 |
| Sh. R.K. Bhalla |
ZE(West-I) |
25125273 |
| Sh. Anil Kumar |
ZE(West-I) |
25125273 |
| Sh. Y.R.S. Raju |
ZE(West-I) |
25125273 | |
|
WEST -II |
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. |
EE (West-II) |
25913870 |
| Sh. P.S. Bhardwaj |
ZE(West-II) |
25913870 |
| Sh. Hargyan Singh |
ZE(West-II) |
25913870 |
| Sh. B.K. Chauhan |
ZE(West-II) |
95120-2584180 |
| Sh. H.U. Khan |
ZE(West-II) |
2591387 |
| Sh. B.N. Sharma |
ZE(West-II) |
25932426 | |
|
WEST -III |
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. |
EE(West-III) |
25471004 |
| Sh. Jasbir Singh |
ZE(West-III) |
25471004 |
| Sh. L.K. Verma |
ZE(West-III) |
25471004 |
| Sh. J.K. Bhardwaj |
ZE(West-III) |
25471004 | |
|
SOUTH WEST -I |
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. |
EE(South West-I) |
25547658 |
| Sh. Kirat Singh |
ZE (South West-I) |
25535659 |
| Sh. Arun Gupta |
ZE (South West-I) |
25535659 |
| Sh. S.P. Hasija |
ZE (South West-I) |
25535659 | |
|
SOUTH WEST-II |
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. |
EE(South West-II) |
25321298 |
| Sh. Harish Chander |
ZE (South West-II) |
25321298 |
| Sh. Mohin Khan |
ZE (South West-II) |
26896112 |
| Sh. P.K. Ghera |
ZE (South West-II) |
26896112 |
| Sh. Dharam Singh |
ZE (South West-II) |
25321298 |
| Sh. S.K.Bhagat |
AE(E&M) |
26167618 | |
SOUTH WEST-III
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. |
EE(South West-III) |
26167618 |
| Sh. N.K. Khare |
ZE(South West-III) |
26100644 |
| Sh. O.P. Gaur |
ZE(South West-III) |
26100644 |
| Sh. Naresh Kapoor |
ZE(South West-III) |
26100644 | |
|
SOUTH -I |
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. |
EE(South -I) |
26644688 |
| Sh. K. N. Dhyani |
ZE(South-I) |
26644688 |
| Sh. Ghanshyam |
ZE(South-I) |
26644688 |
| Sh. A.P. Garg |
ZE(South-I) |
26644688 |
| Sh. Yash Parkash |
AE(E&M) South-I |
26644688 | | SOUTH -II
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. |
EE(South -II) |
29819065 |
| Sh. V.K. Sarna |
ZE(South-II) |
29819065 |
| Sh. Sandeep Kulshrestha |
ZE(South-II) |
29819065 |
| Sh. S.P. Singh |
ZE(South-II) |
29819065 |
| Sh. V.P. Yadav |
ZE(South-II) |
29819065 |
| Sh. Brij Pal |
ZE(South-II) |
26473726 |
| Sh. P.L. Goel |
ZE(South-II) |
29819065 |
| Sh. A.K.Aggarwal |
ZE(South-II) |
29819065 |
| Sh. S.R. Bhati |
ZE(South-II) |
29819065 |
SOUTH -III
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. |
EE(South -III) |
26413037 |
| Sh. Anis-ur-Rehman |
ZE(South-III) |
26413037 |
| Sh. Vijay Kakkar |
ZE(South-III) |
26413037 |
| Sh. S.A. Khan |
ZE(South-III) |
26413037 |
| Sh. L.L. Meena |
ZE(South-III) |
26413037 |
| Sh. Sarup Singh |
ZE(South-III) |
26413037 |
SOUTH -IV
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. |
EE(South -IV) |
29941458 |
| Sh. B.C. Patel |
ZE(South-IV) |
29941458 |
| Sh. Mohd. Anis |
ZE(South-IV) |
29941458 |
| Sh. H. R. Saini |
AE(E&M) |
29941458 |
EAST-I
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. |
EE(East-I) |
22727815 |
| Sh. Vijay Pal Singh |
ZE(East-I) |
22727815 |
| Sh. Naresh Kr. Dargan |
ZE(East-I) |
22727815 |
| Sh. S.D. Sharma |
ZE(East-I) |
22727815 |
| Sh. H.K. Chawla |
ZE(East-I) |
22045369 |
| Sh. Mahender Singh |
ZE(East-I) |
22045369 |
| Sh. Rajeev Gupta |
ZE(East-I) |
22045369 |
EAST-II
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. |
EE(East-II) |
22517270 |
| Sh. Sat Prakash |
ZE(East-II) |
22517270 |
| Sh. S.P. Singh |
ZE(East-II) |
22517270 |
| Sh. V.K. Singh |
ZE(East-II) |
22517270 |
| Sh. D.P. Singh |
ZE(East-II) |
22517270 |
| Sh. R.K. Singh |
ZE(East-II) |
22517270 |
| Sh. S.C. Gupta |
ZE(East-II) |
22047239 |
NORTH EAST-I
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. |
EE(North East-I) |
22130695 |
| Sh. V.K. Gupta |
ZE(North East-I) |
22130695 |
| Sh. S. K. Sharma |
ZE(North East-I) |
22130695 |
| Sh. R.K. Singh |
ZE( North East-I) |
22130695 |
| Sh. Dev Kumar |
ZE(North East-I) |
22130695 |
| Sh. Raj Pal Singh |
ZE(North East-I) |
22130695 |
| Sh. Rattan Pal Singh |
ZE(North East-I) |
22130695 |
NORTH EAST-II
| NAME OF THE OFFICER |
DESIGNATION |
TEL. NO. |
| Sh. |
EE(North East-II) |
22584843 |
| Sh. Vijay Sagar |
ZE(North East-II) |
22584843 |
| Sh. K.K. Harit |
ZE(North East-II) |
22584843 |
| Sh. Narian Singh |
ZE( North East-II) |
22584843 |
| Sh. Vimla Parshad |
ZE(North East-II) |
22584843 |
| Sh. Z.A. Khan |
ZE(North East-II) |
22584843 |
|
|
|
| REVENUE (BILLING) |
| I. |
A-TARIFF APPLICABLE AS ON 1998 - w.e.f July 1998 to 30 Nov.2004
| CATEFORY-I (DOMESTIC) |
EFFECTIVE FROM IST JULY, 1998 |
| Upto 10,000 litres per month |
Rs.0.35+50% per 1000 litres. |
Above 10,000 litres/and upto 20,000 litres per month |
Rs. 1.00+50% per 1000 litres. |
Above 20,000 litres and upto 30,000 litres per month. |
Rs. 1.50+50% per 1000 Litres. |
| Above 30,000 litres |
Rs. 3.00+50% per 1000 litres. |
| Minimum charges. |
Rs.20.00+50% Per month per water Connection |
Un-metered water connection for three months only. |
Rs.20.00+50% per Month per water Connection. (After Three months, it will be Doubled). |
Water connections in J.J. / Resettlement Colonies / Rural areas. |
Rs. 20.00+50% per Month per water Connection. |
| CATEGORY III (NON-DOMESTIC) |
EFFECTIVE FROM IST JUNE, 1998 |
| Upto 50,000 litres per month. |
Rs. 5.00+50% per 1000Litres. |
| Above 50,000 litres |
Rs. 10.00+50% per 1000 litres. |
| Minimum Charges. |
Rs. 100.00 + 50% per Month per water Connection. |
| CATEGORY III (NON-DOMESTIC) |
EFFECTIVE FROM IST JUNE, 1998 |
| Upto 50,000 litres per month. |
Rs. 8.00+50% per 1000Litres. |
Above 50,000 litres and upto 1,00,000 litres per month. |
Rs. 12.00+50% per 1000 litres.s |
| Above 1,00,000 litres |
Rs. 16.00+50% per 1000 litres.1 |
| Minimum charges. |
Rs. 300+50% per month Per water connection. | |
| II. |
B-Tarrif applicable w.e.f 01.12.2004 to 31.03.2005
Service Charges + Water Consumption charges at rate as given at "A"
|
Categories Domestic |
Description of Domestic Units |
Charges per month (M) |
|
C-I (A) |
JJ/ Resettlement colonies/ Rural areas/ Janta Flats/LIG /MIG/HIG/ Single Room Tenements / Type-I/II/III/IV Govt. Quarters and other houses having built up area upto 200 sq. mtr only and Religious Places /Dharamshalas /Cremation Grounds /orphanages/ Homes for destitute / Pioas / Institutes for Physically Handicapped and Mentally Retarded persons. Hostels of Educational institutes / Attached Hostels/ Working women's hostels irrespective of built up areas. |
Rs.40/- per month per connection |
| C-I (B) |
Residential Premises having built up area above 200 Sq. Mtr |
Rs.120/- per month per water connection |
C- Tarrif applicable w.e.f. 01.04.2005
Service Charges(as above)+ Volumetric Water Charges(as below)
| Category I |
Category II |
Category III |
|
Consumption
(per month) |
Rs. (B)
per Kl. |
Consumption
(per month) |
Rs. (B)
per Kl. |
Consumption
(per month) |
Rs. (B) per Kl. |
|
Upto 6 |
0 |
Upto 25 Kls |
10.00 |
Upto 25 Kls |
15.00 |
|
7- 20 |
2.00 |
Above 25 Kls and upto 50 Kls. |
20.00 |
Above 25 Kls and upto 50 Kls. |
25.00 |
|
21- 30 |
7.00 |
Above 50 Kls |
30.00 |
Above 50 Kls and upto100 Kls. |
35.00 |
|
Above 30 Kls |
10.00 |
|
|
Above 100 Kls. |
50.00 |
|
1. The second part of the tariff is volumetric Water Charges is based on actual consumption and to be calculated as 1.5 B X .
Hence, the bill will be calculated as follows:- P= M + 1.5 B X Where, M= Minimum service Charges
B= Block tariff rates per KL.
X= Units consumption in KL.
P = Total Bill.
• M =MINIMUM service CHARGES. (Rs.)
• B= Block tariff rate per KL (Rs./Kl.)
• X= Units consumed in KLs. (Number)
2 50% of water consumption charges is towards sewerage maintenance.
3 In addition, Water Cess Charges shall continue to be recovered at the previous rate of 2- paise per Kl. till revised by the Central Govt./ DJB.
4 Meter Maintenance (Rent) charge @ Rs. 10.00 PM in case of DJB supplied water meters after expiry of warranty period. |
SURCHARGE LEVIED IN ALL CATEGORIES
| Water Meter Reading and billing |
Area Meter Reader from the office of ZRO(Water) |
Bulk W.C. -Monthly Metered W.C.-quarterly Unmetered: Flat rate - Monthly Commercial - -do- |
| Issue of Water Charges Bill. |
Z.R.O.(Water) |
Same as above |
| Time limit for making payment of water charges. |
By the consumer |
10 to 15 days |
5% surcharge is levied if payment is not made within specified date. Surcharge is payable on the total due amount.
Delhi Jal Board charges water and sewerage development charges from Unauthorized/Regularized colonies. However, villages and bonafide residents of extended area of village under Lal Dora are exempted from depositing the Development Charge. Rate of water and sewer development charge is as under: -
Rate of Water Development Charges:
|
Rate of Water Development Charges per sq.m. of the plot area |
|
w.e.f. 01.04.2001 |
Rs. 123.00 |
|
w.e.f. 01.04.2002 |
Rs. 138.00 |
|
w.e.f. 01.04.2003 |
Rs. 155.00 |
|
w.e.f. 01.04.2004 |
Rs. 174.00 |
|
w.e.f. 01.04.2005 |
Rs. 195.00 |
Rate will be reviewed after 31.03.2006.
Rate of Sewerage Development Charges:
|
For colonies notified prior to 06.12.1999, sewerage development charges is based on Date of notification |
Rate per Sq.m. of the plot area |
|
w.e.f. 02.04.1987 |
Rs. 45.00 with 12% compound interest |
|
w.e.f. 01.11.1990 |
Rs. 55.00 with 12% compound interest |
|
w.e.f. 05.04.1994 to 05.12.1999 |
Rs. 100.00 with 12% simple interest |
|
w.e.f. 06.12.1999 to 31.03.2005 |
Rs. 160.00 alongwith rebate of 50% and 45% for plot size upto 100 Sq.m. and plot size above 100 Sq.m. respectively subject to payment in lump-sum upto 31.03.2006 +12% penal interest in rate every subsequent year w.e.f. 01.04.2006 |
Criteria of levy of Sewerage Development Charges have been revised recently on the basis of date of completion of work of laying of sewer line in the respective colony. Accordingly, colonies where work of laying of sewer line has been completed upto 31 March 2005 rate of Rs. 160/- is applicable along with above rebate scheme.
In case of colonies where work is being completed in current financial year 2005-06 rate of Sewerage Development Charges is Rs. 179/- per Sq.m. with rebate of 20% for full and final payment.
|
| III. |
GENERAL INFORMATION WITH TENTATIVE TIME SCHEDULE
| Payment can be made |
In the office of ZRO (Water) |
From 9.00 AM to 2.00 PM without lunch break on all working days. |
| - |
Authorized S.B.I. Branches |
As per bank's working hours. |
| - |
Authorized Syndicate Bank Branches |
-Do- |
| - |
Authorized Canara Bank Branches |
-Do- |
| - |
N.B. Payment of computerized bill is accepted at any cash counter of computerized Zonal Revenue Office. |
-Do- |
Surcharge, if payment is not made within specified date. |
5% |
Surcharge is payable on total due |
| Issue of duplicate bill |
By ZRO(Water) on request. |
Same date |
Permission for acceptance of part payment |
Concerned ZRO (Water), Dy. DOR (Water) |
Same day. |
Complaint made on personal visit |
ZRO (Water),Dy.Jt. DOR (Water) |
Within 7 days |
| Acknowledgement of complaint received from consumer by post |
Z.R.O.(W) |
Within 3 days of receipt. |
| Final reply to the consumer |
ZRO (Water) / Dy.Jt. DOR (Water) |
Within 15 days | |
| IV |
DISCONNECTION & OTHER WORKS UNDERTAKEN BY THE REVENUE DEPARTMENT
| Disconnection of water connection on request from the consumer |
Within 3 days on deposit of disconnection fee of Rs. 100/- per connection. |
| Disconnection of Water Connection from service line due to non-payment |
Rs. 100/- per connection. |
| Disconnection of Water Connection from Ferrule |
Rs. 1000/- per connection. |
| Opening fee for new water connection only Issue of the current bill |
Rs. 100/- per connection. Same day. |
| Issue of disconnection order |
Within 3 days. |
| Issue of no demand certificate |
Same day of disconnection of water connection. |
| Refund of Meter Security |
Within 30 days of the request from the consumer. |
| Restoration of water supply |
To be restored by the consumer at his own level after clearance of dues. |
| Mutation (Change of name of allottee of water connection) by respective ZRO (W) |
Within 15 days. | | |
| |
LOCATION OF ZONAL REVENUE OFFICES OF DELHI JAL BOARD | |
| NAME OF ZONE |
ADDRESS |
TEL. NO. |
| Central-II |
Tibbia College, Near K.B. P.S., ND-5. |
23546251 |
| North-West-III |
OHT Ashok Vihar, ND- 52. |
27301456 |
| AZRO(North-West)-III |
Kanhaiya Nagar Delhi- 34 |
27784558 |
| West - II |
Primary Building , Moti Nagar, New Delhi |
25932426 |
| West-I |
C-2/B Janakpuri, OHT, ND- 58. |
25557475 |
| AZRO(West)-III |
- Do - |
25252797 |
| South-West-I |
OHT, Najafgarh, Near DVB office ND. |
25322297 |
| North-West-I |
OHT Sultanpuri, Jalebi Chowk, ND. |
25476298 |
| North-West-IV |
16, Rajpur Road, MCD Bldg. ND-54. |
23974264,27615600 |
| North-II |
- Do - |
23974264 |
| North-East-I |
OHT G.T. Rd., Shahdara Delhi. |
22591171 |
| East-I |
OHT Preet Vihar, Delhi. |
22444424 |
| East-II |
Shivpuri, Near Chander Nagar Delhi. |
22047239 |
| North-East-II |
Shanti Moh., Old East Seelampur, Delhi |
22464592 |
| AZRO(North-West)-II |
Punjabi Colony, Narela, Delhi. |
27784558 |
| North-I |
MCD Bldg., Kashmiri Gate, ND-1. |
23915150 |
| Central-I |
Varunalaya Complex, Opp. Naaz Cinema, New Delhi- 5. |
23612792 |
| South-West- III |
Sector- VII, R.K. Puram, New Delhi. |
26193424 |
| South-III |
Near Block-A, G.K.- I, ND. |
29239806 |
| South-II |
Jal Sadan, Lajpat Nagar, ND-24. |
29814106 |
| South-I |
OHT, Mehrauli Rd., Near Qutub Minar. |
26646297 |
| South-IV |
Sarita Vihar, New Delhi |
29941458 | |
| |
LIST OF BANKS AUTHORISED TO ACCEPT WATER BILLS | |
CORPORATION BANK
|
Alipur, Asaf Ali Road , Delhi Road Bawana , Kabeer Nagar Shahdara , Bhikaji Cama Place , Opp Gurdawara Sisganj , Connaught Circus , Dilshad Garden , Friends Colony , Greater Kailash , Gujranwala Town , Hauz Khas , Janakpuri Pankha Road , Kamla Nagar , Karol Bagh , Laxmi Nagar, Janakpuri Distt Centre , Lodhi Complex , Mahipalpur , Mayur Vihar , Mundka , Nangloi , Narela , Palam , Paschim Vihar , Pitampura , Preet Vihar , Rajindra Place , Rohni , Sarita Vihar , Shalimar Bagh , Tilak Nagar , Vasant Kunj , Vasant Vihar , Vasundhara Enclave , Vivek Vihar , Shalimar Bagh , Nutan Vidya Mandir , Varunalaya,Jhandewalan, Phase-II , Delhi Jal Board, Jal Vihar, Lajpat Nagar , Ashok Vihar, Phase-I , Patpar Ganj , Shiksha Bharti School , Sect-7, Dawarka , KG Marg |
STATE BANK OF INDIA |
|
Model Town, Rana Pratap Bagh, Vijay Nagar, Ganata Ghar, Kamla Nagar, Wazirpur Industrial Area, Samaypur Badli, Janak Puri, Hari Nagar, Moti Nagar, Sakur Basti, Tilak Nagar, Mayapuri, Punjabi Bagh, Uttam Nagar, Subhash Nagar, Chowkhandi, Jawala Heri, Naraina, South Patel Nagar, Pusa Road, Padam Singh Road, Lawrence Road, Najafgarh, Palam Gaon, Rithala, Krishna Nagar, G.T. Road, Gandhi Nagar, Seeelampur, Swasthaya Vihar, Gazipur, Sadar Bazar, Azad Market, Pahar Ganj, Chandani Chowk, Fatehpuiri, Central Market, Lajpat Nagar, Defence Colony, Okhla Industrial Estate, Jangpura, R.K. Puram, Vasant Vihar, Moti Bagh, J.N.U., Mehrauli, Badarpur, Kapasheda, Central Secretariat. | |
|
CANARA BANK |
|
Dariya Ganj, Diplomatic Enclave, Deen Dayal Upadhaya Marg, East Patel Nagar, Fountain Gole Market, Green Park, Hauz Khas Market, 3F Kashmiri Gate, Maharani Bagh, Malviya Nagar, Munirka, Padam Singh Marg, Karol Bagh, Pitam Pura, Hauz Quazi, South Extention, Tegor Garden, Trinagar, Vivek Vihar, Wazirpur, Azadpur, Bahadur Shah Zafar Marg, Bhogal Lane, Ganesh Nagar, Jeet Singh Marg, Kalka Ji, Mayur Vihar, Mehrauli, Raja Garden, Rani Bagh, Rohtas Nagar, Shankar Marg, Subroto Park, Triveni Ph-II, Bhagwan Dass Road, Kingsway Camp, Shastri Nagar, Keshav Puram, Vikas Puri, Rajouri Garden, S.D. Area, Sadar Bazar, Sarita Vihar. Kamla Nagar, Mayapuri, Uttam Nagar, G.T. Road, Gandhi Nagar, Pahar Ganj, Chandani Chowk, Lajpat Nagar, Okhla Industrial Estate, R.K. Puram. | |
|
SYNDICATE BANK |
|
Azad Pur, Bavana, Chatterpur, Dhaula Kuan, D.S.I.D. Club, Gur Teg Bhadur Nagar, 34 Mall Road, Haiderpur-42, Janak Puri, Khan Market, DDA Complex Defence Colony, 24 Maya Puri, Nagal Rai, Nangloi, Narela, Naya Bazar, Nirman Vihar, Palam, Punjabi Bagh, Shahdara, Vasant Vihar, Vayu Bhawan, Maulana Azad Medical College, Central Revenue Building, Hari Nagar Ext. Counter, Sarojini Nagar Ext. Counter, Kamla Nagar, Chandani Chowk, Lajpat Nagar, Fatehpur Beri. | |
| DEVELOPMENT CHARGES |
|
Delhi Jal Board charges water and sewerage development charges from Unauthorized/Regularized colonies. However, villages and bonafide residents of extended area of village under Lal Dora are exempted from depositing the Development Charge. Rate of water and sewer development charge is as under: -
Rate of Water Development Charges:
|
Rate of Water Development Charges per sq.m. of the plot area |
|
w.e.f. 01.04.2001 |
Rs. 123.00 |
|
w.e.f. 01.04.2002 |
Rs. 138.00 |
|
w.e.f. 01.04.2003 |
Rs. 155.00 |
|
w.e.f. 01.04.2004 |
Rs. 174.00 |
|
w.e.f. 01.04.2005 |
Rs. 195.00 |
Rate will be reviewed after 31.03.2006.
Rate of Sewerage Development Charges:
|
For colonies notified prior to 06.12.1999, sewerage development charges is based on Date of notification |
Rate per Sq.m. of the plot area |
|
w.e.f. 02.04.1987 |
Rs. 45.00 with 12% compound interest |
|
w.e.f. 01.11.1990 |
Rs. 55.00 with 12% compound interest |
|
w.e.f. 05.04.1994 to 05.12.1999 |
Rs. 100.00 with 12% simple interest |
|
w.e.f. 06.12.1999 to 31.03.2005 |
Rs. 160.00 alongwith rebate of 50% and 45% for plot size upto 100 Sq.m. and plot size above 100 Sq.m. respectively subject to payment in lump-sum upto 31.03.2006 +12% penal interest in rate every subsequent year w.e.f. 01.04.2006 |
Criteria of levy of Sewerage Development Charges have been revised recently on the basis of date of completion of work of laying of sewer line in the respective colony. Accordingly, colonies where work of laying of sewer line has been completed upto 31 March 2005 rate of Rs. 160/- is applicable along with above rebate scheme. In case of colonies where work is being completed in current financial year 2005-06 rate of Sewerage Development Charges is Rs. 179/- per Sq.m. with rebate of 20% for full and final payment. | |
| I. |
UNAUTHORIZED REGULARISED COLONIES
-
In case of Unauthorised regularized colonies where water and sewerage lines were laid and notified before 02.04.1987, Rs.15/- and Rs.45/- per sq. mt. will be charged for water and sewerage respectively plus 12% compound interest per annum w.e.f. 02.04.1987.
-
Services lay between 01.11.1990 to 04.4.1994, Rs. 20/- and Rs. 55/- per sq. mt. plus 12% compound interest will be levied for water and sewerage respectively from the date of notification.
-
Services laid after 05.04.1994 onwards, Rs. 55/- and Rs. 100/- per sq. mt. plus 12% simple interest for water and sewerage will be levied from the date of notification.
-
The rates of development charges for provision of Water & Sewage facility in unauthorized regularized colonies of Delhi have been raised to Rs. 110/- and Rs. 200/- per sq. meter respectively vide resolution No.481 dated 6-12-1999. The revised rates are effective from 4-2-2000. However the Board has also decided that old rates will be charged from those plot holders who had paid 75% or more of the first advance installment for the colony as a whole before 4-2-2000. The old rates will also be charged from those colonies which were asked in writing before 4-2-2000 to deposit the development charges if such pays 75% or more of its advance installment at the pre-revised rates.
-
The revised rates shall be automatically incremented annually by 12% starting from 1st April 2001.
-
A rebate of 20% shall be granted to the plot holders, if they make full payment of development charges in lump sum on revised rates within 3 months from the date of issue of the first bill. If not, the entire development charges shall be recovered from him in 20 equated quarterly installments.
-
It shall be mandatory on the part of plot-holders to pay sewer development charges irrespective of the fact whether they take the sewer connection or not. The onus for paying the mandatory sewer development charges shall lie on the plot holder alone right from the date of notification. The water supply shall be liable to be disconnected in case of default.
-
A compound surcharge of 5% on the total amount shall be levied if the water/sewer development charges installments are not paid within due date.
-
Old agreement cases shall continue to be governed by the old rates, as applicable. |
| II. |
UNAUTHORIZED UNREGULARISED COLONIES
-
Rates for water development charges for provision of water lines in unauthorized unregularised colonies has been revised from the existing Rs. 55/- per sq. meter to Rs. 110/- per sq. meter. If the payment of full amount of development charges is made within three months of the receipt of Ist bill, 10% rebate will be given.
-
Water lines will be laid on payment of first advance installment of Rs. 25/- per sq. meter of the plotted area.
-
The tender will be called only on receipt of 50% of the first installment and work will be executed only after receipt of 75% of the first advance installment from the colony as a whole.
-
After execution of the scheme water connections will be released on payment of another Rs. 25/- per Sq. Mt. and the balance will be payable in 20 equated quarterly installment.
For any further clarification with regard to payment of development charges kindly contact Survey Officer of the respective zone. | |
| GRIEVANCE REDRESSAL |
| I. |
SANCTION OF NEW WATER CONNECTION
In case of any difficulty regarding sanction of new water connection, concerned Zonal Revenue Officer/ Zonal Engineer (W) / Executive Engineer (Water) / Suptdg. Engineer (W) and Chief Engineer (C)-I can be contacted as schedule below: -
Zonal Revenue Officer/ Zonal Engineer (W) |
On all working days between 2.00 P.M. to 4.00 P.M. |
| Ex. Engineer (Water) |
-do- |
| Supdtg.Engineer (Water) |
On all working days between 12 Noon to 1.00 P.M. |
| Chief Engineer (Civil)-I |
-do- |
| Complaints made on personal visit. |
Will be sorted out within 7 days. |
Acknowledgement of complaints received by post. |
Within 3 days. |
| Final reply to the complaint. |
Within 15 days. | |
| II. |
REDRESSAL OF COMPLAINTS IN REGARD TO WATER / DEVELOPMENT CHARGES / BILLING
In case of any difficulty with regard to billing of Water charges/ Development Charges, Mutation of water connections, wrong indication of category etc., ZRO (W)/Survey Officer concerned/Dy.DOR (W)/Jt. Director concerned/Director of Revenue (Water) may be contacted.
Complaints/Inquires will be attended by ZRO (W) |
On all working days between 2 PM to 4 PM |
Attending to complaints by Dy. Director(Rev.) |
-do- |
Attending to complaints by Joint Director (Rev.) |
12 noon to 1 PM |
Attending to complaints by Director(Rev.) |
On all working days between 12 noon to 1.00 PM |
Complaints made on personal visit regarding billing |
Such complaints will be sorted out within 7 days. |
Acknowledgement of the complaints received by post. |
Within 3 days. |
| Final reply to the consumer |
Within 15 days. | >>>Replacement of Defective Water Meters and Billing related issues<<< | |
SOME DO's & DON'Ts FOR PROPER UTILIZATION AND CONSERVATION OF WATER |
|
|
|
DO's.....
-
Use I.S.I. marked G.I. Pipes and fittings.
-
All fittings and works should be got done through Qualified Plumbers only.
-
All fittings/pipes, from connection points onwards, be got checked periodically to detect leakages /contamination.
-
Old rusted service pipes be replaced immediately to avoid contamination of water/damage to the building and wastage of water.
-
To avoid overflow and wastage of water, Ball Cocks are provided in Over Head/Underground tank.
-
All leakages are plugged immediately.
-
Storage tanks should be cleaned and disinfected periodically.
-
Store water in a tank on ground floor and then boost to the upper floors.
-
Water container should be kept clean and covered.
-
Small size flush cisterns with regulatory mechanism for release of water should be used.
-
To avoid inconvenience, please pay water charges bill regularly before due date.
-
Conserve water, as every drop of drinking water is precious.
Don'ts.....
-
Never use booster pumps directly on service pipe to avoid contamination of water due to suction.
-
Water line should not pass through sewer manhole or open drain.
-
Water from damaged hydrants should not be used.
-
Don't use potable water for washing of floor / cars / animals and gardening etc.
|
|
| |
|
|
|