Water
Sewer
Bio-Gas
Downloadable Forms
FAQ
Help Desk
Telephone Directory
E-mail Addresses
Water Meter Replacement Issue
Revenue zones according to assembly constituencies
Sewer Connection

Consumer Section

How to Apply

  1. For obtaining a sewer connection for areas falling in the jurisdiction of MCD, the consumer should contact the concerned Zonal Engineer(C)-Sewer.

  2. The consumer can obtain a sewer connection in seaward areas in Approved colonies, Unauthorised / Regularised Colonies, Resettlement Colonies / Urban Villages, Rural Villages for Domestic / Commercial / Industrial purposes as provided under the drainage bylaws and amendments issued from time to time.


TYPE OF SETTLEMENT DOCUMENTS REQUIRED
Approved Colonies
Proof of occupancy: Attested copy of ration card/Election card/any other valid document
Attested copy of sanctioned plan of building
Attested copy of Sale Deed/ Lease Deed/ Allotment Letter / Power of Attorney
------
------
Resettlement Colonies / Urban Villages
Proof of occupancy: Attested copy of ration card/Election card/any other valid document
Attested affidavit as per prescribed proforma
Attested copy of Sale Deed/ Lease Deed/ Allotment Letter / Power of Attorney
-----
-----
Unauthorised / Regularised Colonies
Proof of occupancy: Attested copy of ration card/Election card/any other valid document
Attested affidavit as per prescribed proforma
Attested copy of Sale Deed/ Lease Deed/ Allotment Letter / Power of Attorney
-----
-----
Rural Villages
Proof of occupancy: Attested copy of ration card/Election card/any other valid document
Attested affidavit as per prescribed proforma
Attested copy of Sale Deed/ Lease Deed/ Allotment Letter / Power of Attorney
Lal Dora certificate
Attested affi-davit showing habitation in Rural area for the last over 20 years
Commercial Category
Proof of occupancy: Attested copy of ration card/Election card/any other valid document
Attested affidavit as per prescribed proforma
Attested copy of Sale Deed/ Lease Deed/ Allotment Letter / Power of Attorney
Attested copy of Trade License for repairing/ manufacturing unit
Certificate of activities in commercial area & NOC from DPCC in Case of restaurants, Sweet shops, nursing Homes, auto work shops, small scale industries and dairies
Factories / Industries
Proof of occupancy: Attested copy of ration card/Election card/any other valid document
Attested affidavit as per prescribed proforma
Attested copy of Sale Deed/ Lease Deed/ Allotment Letter / Power of Attorney
Attested copy of Trade License for repairing/ manufactur- -ing unit
Attested copy of Factory / Industry License

  1. The Developing Agencies, before laying of sewer services, are required to get the sewerage scheme approved from the planning circle of the Delhi Jal Board located at Varunalaya Phase-I, Jhandewalan, Karol Bagh, New Delhi-110005.

  2. The Sewerage scheme is to be submitted in five sets through layout approving authority alongwith the hydraulic calculations and other details as under: -

     I. Hydraulic Calculations: -

  1. S.No.

  2. Reference line

  3. Length (Mtrs)

  4. Average Sewage Generation

  5. Peak Sewage Discharge

  6. Sub Soil Infiltration

  7. Total Discharge

  1. Diameter (mm)

  2. Gradient

  3. Capacity

  4. Initial Point-G.L.

  5. Initial Point-I.L.

  6. End Point-G.L.

  7. End Point-I.L.

Remarks
  1. After scrutiny of the scheme by Planning Circle, approval is conveyed to the developing agency indicating size of sewer connection with G.L. I.L. and connection level at the receiving Manhole of the Delhi Jal Board, Sewer Line, to be made by the developing agency.

  2. The approval is conveyed within 20 days of deposit of proportionate charges if any.

  3. On approval of the scheme by the Planning Circle, the Applicant is required to apply for sanction of sewer connection in the office of Zonal Engineer (Civil) Sewer of the area.

  4. The sewer connection shall be sanctioned within 30 days.

  5. The developing agency is required to lay and maintain the connection and conveyance sewer line upto the Delhi Jal Board manhole/line.



PARTICULARS ACTION BY TIME SCHEDULE
Issue of application forms Area Zonal
Engineer (C) S
On all working days between 10 a.m. to 4 p.m. Cost Rs.10/-
Acceptance of application
form and issue of acknowledgement.
Area Zonal
Engineer (C) S
Form complete in all respect shall be accepted on the spot.
Technical clearance and intimation
to the consumer and ZRO (W).
Area Zonal
Engineer (C) S
/
Competent Authority
Domestic connection within 7 days, Non-domestic within 15 days.
Development charges / unauthorized
sewer connection report
ZRO(W) /
Survey Officer
Within 3 days.
Sewer permission Area Zonal
Engineer (C) S
To be obtained by Licensed/ Qualified Plumber from Zonal Engineer (C) S

  1. Road Restoration charges estimate to be obtained by the applicant from Zonal Engineer(C )s MCD and same to be deposited with his office.

  2. Any sewer connection installed in violation of the above procedure, either on the part of the applicant or the plumber engaged by him, shall be treated as unauthorized sewer connection and is liable to be disconnected without any notice. The same can, however, be regularized on submission of application and completion of all the above formalities with payment of penalty as applicable from time to time.


The consumer will have to pay enhanced penalty / charge together with cumulative sewer charges for 3 years as under: -

I. Penalty of Rs.500 per unauthorized sewer connection.
II. Sewer charges as applicable from time to time from respective categories for last three years.
III. Development charges whenever applicable will be recovered in installments.

 

CENTRAL -I
NAME OF THE OFFICER DESIGNATION TEL. NO.
Sh. Mahinder Kumar EE(Central-I) 23269053
Sh. Jasbir Singh ZE(Central-I) 23269053
Sh. Kutub Singh ZE(Central-I) 23280065
Sh. Mohd. Saleem ZE(Central-I) 23269053
Sh. J.P.Gupta ZE(Central-I) 23280065
Sh. M.S.Khan ZE(Central-I) 23280065
Sh. Chanderjit Kumar ZE(Central-I) 23280065
Sh. R.K.Singh ZE(Central-I) 23280065
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO.
Sh. Radhe Shyam EE(Central-II) 23968431
Sh. Bindra Prasad ZE (Central-II) 23968431
Sh. Devender Giri ZE (Central-II) 23968431
Sh. Horender Kumar ZE (Central-II) 23968431
Sh. R.K.Jain ZE (Central-II) 23968431
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO.
Sh. Vijay Singh EE (North-I) 27604862
Sh. P. C. Aggarwal ZE(North-I) 27604862
Sh. S.K.Singh ZE(North-I) 27604862
Sh. Toran Singh ZE(North-I) 27604862
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. M.K. Jain EE (North-II) 27654862 27931581
Sh. R.C.Duggal ZE (North-II) 27654862 20905832
Sh. Akash Malik ZE (North-II) 27654862 27882730
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. P.K.Tyagi EE (North West-I) 25964317 22578245
Sh. Lalit Kumar Singhal ZE(North West-I) 25964317 --
Sh. R.P. Kukreja ZE(North West-I) 27924132 27015138
Sh. Bijender Kumar ZE(North West-I) 25964317 9891240457
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. Shalabh Kumar EE(North West-II) 27061040 27346992
Sh. Horender Kumar ZE(North West-II) 27061040 27051960
Sh. Liaqat Ali ZE(North West-II) 27061040 25286611
Sh. A.J. Khan ZE(North West-II) 27061040 27345410
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. G.R.K. Bansal EE(North West-III) 27462285 27341743
Sh. K.S. Shukla ZE(North West-III) 27464656 27651186
Sh. R. K. Sharma ZE(North West-III) 27416373 9868404025
Sh. R.C. Sharma ZE(North West-III) 27464656 22913399
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO.
Sh. Adarsh Kumar EE (North West-IV) 27615600
Sh. V.P. Yadav ZE(North West-IV) 27615600
Sh. R.C.Duggal ZE(North West-IV) 47092861
Sh. R.C.Sharma ZE(North West-IV) 27615600
Sh. A.K.Bhardwaj ZE(North West-IV) 27673064
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. Virender Kumar EE (West-I) 25125273 27863535
Sh. S.P. Goel ZE(West-I) 25125273 25261894
Sh. R.K. Bhalla ZE(West-I) 25125273 25521313
Sh. Anil Kumar ZE(West-I) 25125273 25997593
Sh. Y.R.S. Raju ZE(West-I) 25125273 27857863
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. Rakesh Kumar Sahani EE (West-II) 25913870 25132949
Sh. P.S. Bhardwaj ZE(West-II) 25913870 25285766
Sh. Hargyan Singh ZE(West-II) 25913870 25258932
Sh. B.K. Chauhan ZE(West-II) 95120-2584180 9811961831
Sh. H.U. Khan ZE(West-II) 2591387 26986627
Sh. B.N. Sharma ZE(West-II) 25932426 27413688
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. R.K. Singhal EE(West-III) 25471004 27943271
Sh. Jasbir Singh ZE(West-III) 25471004 9811254069
Sh. L.K. Verma ZE(West-III) 25471004 25543060
Sh. J.K. Bhardwaj ZE(West-III) 25471004 27944797
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. Arvind Sharma EE(South West-I) 25547658 27212154
Sh. Kirat Singh ZE (South West-I) 25535659 25591231
Sh. Arun Gupta ZE (South West-I) 25535659 27040190
Sh. S.P. Hasija ZE (South West-I) 25535659 25139954
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. Radhey Shyam EE(South West-II) 25321298 27516149
Sh. Harish Chander ZE (South West-II) 25321298 951262243398
Sh. Mohin Khan ZE (South West-II) 26896112 26847938
Sh. P.K. Ghera ZE (South West-II) 26896112 29835461
Sh. Dharam Singh ZE (South West-II) 25321298 25365546
Sh. S.K.Bhagat AE(E&M) 26167618 26847938
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. Anand Pal EE(South West-III) 26167618 26013949
Sh. N.K. Khare ZE(South West-III) 26100644 22750389
Sh. O.P. Gaur ZE(South West-III) 26100644 29813773
Sh. Naresh Kapoor ZE(South West-III) 26100644 26842844
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. R.P. Singh EE(South -I) 26644688 26562929
Sh. K. N. Dhyani ZE(South-I) 26644688 27956628
Sh. Ghanshyam ZE(South-I) 26644688 951202883382
Sh. A.P. Garg ZE(South-I) 26644688 55296424
Sh. Yash Parkash AE(E&M) South-I 26644688 22506233
 
 
SOUTH -II
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. Narender Kumar Tomar EE(South -II) 29819065 27564411
Sh. V.K. Sarna ZE(South-II) 29819065 26102658
Sh. Sandeep Kulshrestha ZE(South-II) 29819065 26301672
Sh. S.P. Singh ZE(South-II) 29819065 26911191
Sh. V.P. Yadav ZE(South-II) 29819065 26922944
Sh. Brij Pal ZE(South-II) 26473726 26132983
Sh. P.L. Goel ZE(South-II) 29819065 22063609
Sh. A.K.Aggarwal ZE(South-II) 29819065 25594125
Sh. S.R. Bhati ZE(South-II) 29819065 29816184
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. Ashok Kumar Phull EE(South -III) 26413037 26285339
Sh. Anis-ur-Rehman ZE(South-III) 26413037 26983813
Sh. Vijay Kakkar ZE(South-III) 26413037 951292423533
Sh. S.A. Khan ZE(South-III) 26413037 26987468
Sh. L.L. Meena ZE(South-III) 26413037 26890487
Sh. Sarup Singh ZE(South-III) 26413037 25035040
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. Y.P. Manchanda EE(South -IV) 29941458 27136799
Sh. B.C. Patel ZE(South-IV) 29941458 29815922
Sh. Mohd. Anis ZE(South-IV) 29941458 27343450
Sh. H. R. Saini AE(E&M) 29941458 22459896
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. Prahlad Singh EE(East-I) 22727815 27313547
Sh. Vijay Pal Singh ZE(East-I) 22727815 22145876
Sh. Naresh Kr. Dargan ZE(East-I) 22727815 22596843
Sh. S.D. Sharma ZE(East-I) 22727815 22753735
Sh. H.K. Chawla ZE(East-I) 22045369 --
Sh. Mahender Singh ZE(East-I) 22045369 22014784
Sh. Rajeev Gupta ZE(East-I) 22045369 22529913
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. B.P. Saraswat EE(East-II) 22517270 22917368
Sh. Sat Prakash ZE(East-II) 22517270 22463323
Sh. S.P. Singh ZE(East-II) 22517270 9810745165
Sh. V.K. Singh ZE(East-II) 22517270 22812382
Sh. D.P. Singh ZE(East-II) 22517270 95120-2457871
Sh. R.K. Singh ZE(East-II) 22517270 22515757
Sh. S.C. Gupta ZE(East-II) 22047239 95120-2631446
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. S.K. Bhardwaj EE(North East-I) 22130695 22164351
Sh. V.K. Gupta ZE(North East-I) 22130695 951202632796
Sh. S. K. Sharma ZE(North East-I) 22130695 22176499
Sh. R.K. Singh ZE( North East-I) 22130695 22383726
Sh. Dev Kumar ZE(North East-I) 22130695 22244413
Sh. Raj Pal Singh ZE(North East-I) 22130695 9811527563
Sh. Rattan Pal Singh ZE(North East-I) 22130695 22589821
 
 
NAME OF THE OFFICER DESIGNATION TEL. NO. (Office) TEL. NO. (Resi)
Sh. Mool Chand EE(North East-II) 22584843 51491473
Sh. Vijay Sagar ZE(North East-II) 22584843 22572944
Sh. K.K. Harit ZE(North East-II) 22584843 22917880
Sh. Narian Singh ZE( North East-II) 22584843 22619971
Sh. Vimla Parshad ZE(North East-II) 22584843 25554546
Sh. Z.A. Khan ZE(North East-II) 22584843 27345966
 


I.

UNAUTHORIZED REGULARISED COLONIES

  • In case of Unauthorised regularized colonies where water and sewerage lines were laid and notified before 02.04.1987, Rs.15/- and Rs.45/- per sq. mt. will be charged for water and sewerage respectively plus 12% compound interest per annum w.e.f. 02.04.1987.

  • Services lay between 01.11.1990 to 04.4.1994, Rs. 20/- and Rs. 55/- per sq. mt. plus 12% compound interest will be levied for water and sewerage respectively from the date of notification.

  • Services laid after 05.04.1994 onwards, Rs. 55/- and Rs. 100/- per sq. mt. plus 12% simple interest for water and sewerage will be levied from the date of notification.

  • The rates of development charges for provision of Water & Sewage facility in unauthorized regularized colonies of Delhi have been raised to Rs. 110/- and Rs. 200/- per sq. meter respectively vide resolution No.481 dated 6-12-1999. The revised rates are effective from 4-2-2000. However the Board has also decided that old rates will be charged from those plot holders who had paid 75% or more of the first advance installment for the colony as a whole before 4-2-2000. The old rates will also be charged from those colonies which were asked in writing before 4-2-2000 to deposit the development charges if such pays 75% or more of its advance installment at the pre-revised rates.

  • The revised rates shall be automatically incremented annually by 12% starting from 1st April 2001.

  • A rebate of 20% shall be granted to the plot holders, if they make full payment of development charges in lump sum on revised rates within 3 months from the date of issue of the first bill. If not, the entire development charges shall be recovered from him in 20 equated quarterly installments.

  • It shall be mandatory on the part of plot-holders to pay sewer development charges irrespective of the fact whether they take the sewer connection or not. The onus for paying the mandatory sewer development charges shall lie on the plot holder alone right from the date of notification. The water supply shall be liable to be disconnected in case of default.

  • A compound surcharge of 5% on the total amount shall be levied if the water/sewer development charges installments are not paid within due date.

  • Old agreement cases shall continue to be governed by the old rates, as applicable.

II.

UNAUTHORIZED UNREGULARISED COLONIES

  • Rates for water development charges for provision of water lines in unauthorized unregularised colonies has been revised from the existing Rs. 55/- per sq. meter to Rs. 110/- per sq. meter. If the payment of full amount of development charges is made within three months of the receipt of Ist bill, 10% rebate will be given.

  • Water lines will be laid on payment of first advance installment of Rs. 25/- per sq. meter of the plotted area.

  • The tender will be called only on receipt of 50% of the first installment and work will be executed only after receipt of 75% of the first advance installment from the colony as a whole.

  • After execution of the scheme water connections will be released on payment of another Rs. 25/- per Sq. Mt. and the balance will be payable in 20 equated quarterly installment.

For any further clarification with regard to payment of development charges kindly contact Survey Officer of the respective zone.



DO's Don'ts
  1. The entire sewage system should be properly ventilated.
  1. Do not dispose off paper and plastic waste in the sewer to avoid blockage.
  1. Joints of sewers should be made water tight, & should be properly checked so as to stop the leakage and dampness in the building.
  1. Never allow any clay, grit, sand, or 'malba' to go into the sewer, as these things cause sever blockage.
Chief Minister
Latest News
 
Appeal from Hon. Chief Minister on 12th Five Year Plan - English
Appeal from Hon. Chief Minister on 12th Five Year Plan - Hindi
Census 2011 -Phase I
Census 2011-Phase II
City Plants Million Trees This Monsoon
Delhi Geo-Spatial Data Infrastructure Act, 2011
Guideline for Website Seurity
Results for the post of Geospatial Advisor
RFP bids invited for undertaking comprehensive Socio-economic survey of households in jhuggi jhopdi clusters in delhi
The Delhi Municipal Corporation (Amendment) Act 2011(Delhi Act 12 of 2011)
 
Local Services
 
Feedback
Grievances
 
Important Links
 
List of contractors in Probationary Class in Delhi Jal Board.
List of contractors registered in Delhi Jal Board
Water Tariff (w.e.f 1.1.2012)
Water Tariff Policy
 
Last Updated : 05 Dec,2011