Minister
syllabus for Class-I (Supervisor)
Syllabus for Class-II (Electrician)
Enforcement of The Electricity Act, 2003
Issue of Certificate of Competency Class-I And Class-II And Electrical Contractor Licences under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules, 1956.
Intimation Regarding Electrical Accidents
The Bombay Lift Act -1939 as Extended to NCT of Delhi and The Delhi Lift Rules, 1942
Annexure A and B
Annexure C
Annexure D
Annexure E
Annexure F
Annexure G
Annexure H
Annexure I
Annexure J
Annexure A & B


FEES SCHEDULE

S. No Connected Load of installation etc. Initial Inspection Other than Initial Inspection
1. Upto and including 5 Kws Rs. 100/- One fifth of Fee
Charge for inspection
(for each reinspection)
2. Exceeding 5 Kws but not exceeding 10 Kws Rs. 150/- -do-
3. Exceeding 10 Kws but not exceeding 20 Kws
Rs. 200/- -do-
4. Exceeding 20 Kws but not exceeding 50 Kws Rs. 400/- -do-
5. Exceeding 50 Kws but not exceeding 100 Kws
Rs. 600/- -do-
6. Exceeding 100 Kws but not exceeding 500 Kws + Rs.300/- Rs. 600/- -do-
    For Every 50 Kws or part thereof in excess of 100 Kws provided that if the part does not exceed 5,10 or 20 Kws Rs. 100/-, Rs.150/- or Rs.200/- respectively shall be charged for every such excess.
7. Exceeding 500 Kws but not exceeding 1000 Kws Rs.3000/- + Rs.200/- -do-
    For Every 50 Kws or part thereof in excess of 50 Kws or part thereof in excess of 500 Kws provided that if the part does not exceed 5 or 10 Kws, Rs. 100/- or Rs.150/- respectively shall be charged for every excess.
8. Exceeding 1000 Kws Rs. 5000/- -do-

Fee for inspection, examination or test of any GENERATION STATION or other places in which energy is, or is about to be generated at a pressure of 100 Volts or more.

S. No Connected Load of installation etc. Initial Inspection Other than Initial Inspection
1. Upto and including 25 Kws Rs. 400/- -do-
2. Exceeding 25 Kws but not exceeding 50 Kws
Rs. 750/- -do-
3. Exceeding 50 Kws but not exceeding 100 Kws
Rs. 1250/- -do-
4. Exceeding 100 Kws but not exceeding 250 Kws Rs. 2000/- -do-
5. Exceeding 250 Kws but not exceeding 500 Kws
Rs. 3000/- -do-
6. Exceeding 500 Kws but not exceeding 750 Kws Rs. 3500/ -do-
7. Exceeding 750 Kws but not exceeding 1000 Kws Rs. 4500/ -do-
8. Exceeding 1000 Kws Rs. 5000/- -do-



FEE FOR TRANSFORMERS
S. No Connected Load of installation etc. Initial Inspection Other than Initial Inspection
1. Upto and including 100 Kws
Rs. 400/- -do-
2. Exceeding 100 Kws but not exceeding 250 Kws Rs. 500/- -do-
3. Exceeding 250 Kws but not exceeding 500 Kws Rs. 750/- -do-
4. Exceeding 500 Kws but not exceeding 750 Kws Rs. 1000/- -do-
5. Exceeding 750 Kws but not exceeding 1000 Kws Rs. 1500/- -do-
6. Exceeding 1000 Kws Rs. 2000/- -do-

For H.T. Panel Of Voltage rating upto 33 Kv. Rs. 500/-
H.T. Panel Of Voltage rating above 33 Kv. Rs. 1000/-
FEES FOR CONNECTED LOAD OF INSTALLATION ETC.
S. No Connected Load of installation etc. Initial Inspection Other than Initial Inspection
1. Upto and including 1Kws Rs. 100/- -do-
2. For every additional Kws exceeding Kws exceeding 1 Kws
Rs. 100/- -do-
Upto maximum of Rs. 1000/-
FOR POWER PURPOSES
1. Upto and including 5 Kws exceeding
Rs. 100/- -do-
2. Exceeding 5 Kws but not exceeding 10Kws
Rs. 150/- -do-
3. Exceeding 10 Kws but not exceeding 20 Kws Rs. 200/- -do-
4. Exceeding 20 Kws but not exceeding 50 Kws Rs.400/- -do-
5. Exceeding 50 Kws but not exceeding 100 Kws Rs. 600/- -do-
6. Exceeding 100 Kws but not exceeding 500 Kws
Rs. 600/- + Rs.300/- -do-
    For Every 50 Kws or part thereof in excess of 100 Kws provided that if the part does exceed 5,10 or 20 Kws, Rs. 100/-, Rs.150/- or Rs.200/- respectively shall be charged for every such excess.
7. Exceeding 500 Kws but not exceeding 1000 Kws
Rs.3000/- +Rs.200/- -do-
    For Every 50 Kws or part thereof in excess of 500 Kws provided that if the part does not exceed 5,10 Kws, Rs. 100/- or Rs.150/- respectively shall be Charged for such excess.
8. Exceeding 1000 Kws Rs. 5000/- -do-

FOR MV / L.T.PANEL, SWITCHES & CIRCUIT BREAKERS


S. No Connected Load of installation etc. Initial Inspection Other than Initial Inspection
1. Upto a load of 100 Amps Rs.100/-  
2. Exceeding 100 Amps & upto 1000 Amps Rs. 250/-  
3. Exceeding 1000 Amps Rs. 500/-  
  FEES FOR ANY ELECTRIC TRACTION SYSTEM TROLLEY WIRES OVERHEAD EQUIPMENT OR TEST FOR BONDING AND LEAKAGE CURRENTS. Rs. 1000/-  

FOR MV / L.T.PANEL, SWITCHES & CIRCUIT BREAKERS

S. No Connected Load of installation etc. Initial Inspection Other than Initial Inspection
1. FOR HIGH PRESSURE SERVICE CONNECTION
Rs. 500/-  
2. FOR MEDUIM PRESSURE SERVICE CONNECTION Rs. 200/-  
3. FOR A LOW PRESSURE SERVICE CONNECTION
Rs. 100/-  


S. No Connected Load of installation etc. Initial Inspection Other than Initial Inspection
       

FEES FOR
(A) A high pressure Service line or cable for a distance upto 1.0 km and Rs. 50/- per km. or a part thereof beyond 1.0 km and
Rs. 500/-  
(B) A medium or low pressure service line or Cable for a distance upto one km and Rs. 50/- per kms. Or part thereof beyond one km. Rs. 100/-
Chief Minister
Local Services
 
Feedback
Grievances
 
Important Links
 
Jeevan Centers for Convenience
On Line Registration for Shop And Stablishment
Online Complaint Registration
On Line Services For Directorate Of Employment
 
Last Updated : 04 May,2010
Contact for Help/Grievance Redressal | Vacancy | Messages|RTI Act 2005